Part 145 repair station certification, done for you

We are Part 145 certification consultants who took our own shop through the FAA’s process in 2026. Now we write the manuals, file the application and handle the FAA back-and-forth for yours. You sign, show up for the meetings and keep running your shop.

Tell us about your shop See what the fee covers

A fixed fee, from $25,000. The FAA decides who gets a certificate. We do the work that puts a complete application in front of them.

How we work

We’ve done this before. We know what it takes. We become you and get it done.

Jeff Spear, founder

“Become you” has a formal name: agent for service. You tell the FAA in writing that we act for you. From then on the certification team sends the paperwork to us and takes answers from us.

Your accountable manager stays in charge. We bring you decisions and signature pages. Everything else we handle.

Where applications stall

The FAA now runs initial certifications against a schedule. These are the limits our own certification team set in 2026.

  • The queue

    You wait for the FAA to reach your application, and it doesn’t publish how long that takes. We waited more than a year. Nobody can shorten it. You can be ready the day they call.

  • 45 days to file everything

    After the preapplication meeting we had 45 days to submit the complete formal application: every manual, every form, every answer. Partial uploads were not accepted.

  • Three tries at the documents

    The team reviews the whole package and returns it with findings. We were told an applicant typically gets three submissions. After a third unsuccessful one, the FAA can end the project.

  • 15 days to answer

    FAA policy gives an applicant 15 calendar days to respond to a corrective action notice. With no response, the application can be treated as withdrawn. How the 15 days work.

A shop owner with a full schedule loses to those clocks. Keeping up with them is the job we take.

What we do for your Part 145 application

Four jobs that normally land on the owner. Take all four for the flat fee, or ask about just one.

Who does what, phase by phase

The FAA certificates a repair station in five phases. This is the split of work in each one.

  1. Phase 1 Preapplication

    The clock
    The FAA’s queue, then a fixed meeting date.
    We do
    PASI (Form 8400-6), readiness items, portal accounts, the agent for service letter and meeting prep.
    You do
    Attend the preapplication meeting. Name your accountable manager and key people.
  2. Phase 2 Formal application

    The clock
    45 days from the meeting.
    We do
    Form 8310-3, the full manual set, forms, capability list, personnel roster and data collection tool answers, filed as one complete package.
    You do
    Tell us how your shop really works. Review and sign.
  3. Phase 3 Document review

    The clock
    90 days. Three submissions.
    We do
    Read every finding, revise the full documents, resubmit and answer the team’s questions.
    You do
    Approve any change that affects how you work.
  4. Phase 4 Facility inspection

    The clock
    About 30 days to schedule and complete.
    We do
    A pre-inspection at your shop: one job run through your system and a records check. Then the responses to any findings.
    You do
    Have the facility, tools and people in place. Run a job from intake to release for the inspectors.
  5. Phase 5 Certificate

    The clock
    Days, once the inspection closes.
    We do
    Proofread the draft operations specifications and close open items.
    You do
    Sign, post the certificate and start work under it.

The clocks are the ones our certification team gave us in 2026. Your team sets yours in a schedule of events. The full process, with our dates.

One certification so far: our own

We run a repair station in Sonoma, California. In 2026 the FAA certificated it under part 145 with a limited airframe rating.

We rebuilt the manuals through two FAA returns, answered every data collection tool question and ran the correspondence ourselves. Each return went back to the FAA in 11 days.

That is our whole track record, and we would rather tell you than pad it. What it gives you is a team that did the applicant’s side of this job under the rules in force today.

More about us

  1. The FAA’s certification team tells us we are next
  2. Preapplication meeting: six hours online, with applicants from across the country
  3. Scoping session with our certification project manager
  4. Formal application accepted
  5. Document package returned. Resubmitted in 11 days.
  6. Second return. Resubmitted in 11 days and accepted.
  7. Facility inspection by our local FAA office. Three findings, cleared by 2 November.
  8. Air Agency Certificate issued

This is our file. Yours will have its own dates.

$25,000 fixed, for one location and one limited rating

Manuals, application, agent for service and the FAA interface, from where you are today to the day the certificate is issued. One price, in writing, before we start.

Most firms quote privately. The one other done-for-you price list we found starts at $62,500 for a single limited rating. See the published prices.

Your facility, tooling, calibration and training are yours to fund. So is the wait. Each additional rating is $5,000. Bigger shops get a written quote before anything starts.

See what is included Tell us about your shop

Straight answers

How long does Part 145 certification take?

There are two waits. The first is the FAA’s queue, and the FAA doesn’t publish a standard time for it. Ours lasted more than a year. The second is the certification itself. Ours took 141 days from the preapplication meeting on June 17, 2026 to the certificate on November 5, 2026, including two returns of our documents.

Your dates will differ. We can’t shorten the queue. We can make sure nothing on your side slows the rest. See where each of our days went.

Can you guarantee the FAA will certificate my shop?

No, and nobody honestly can. The FAA decides. What we control is the quality and completeness of what the FAA reads, and how fast every question gets answered. If we look at your shop and think the certificate you want is out of reach, we will say so before you pay us.

You have done one certification. Why would I hire you?

Because we did it under the rules in force now, and we did the work ourselves. Our station was certificated on November 5, 2026 through the FAA’s current system: the national queue, the online preapplication meeting, the 45-day filing deadline, the limit on submissions. We wrote the answers and took the returns.

If you want a firm of former FAA inspectors with a long client list, those exist and some are very good. If you want the applicant’s side of the job done for a flat fee by people who just finished it, that is us.

My shop does different work from yours. Does that matter?

The process, the portals, the deadlines and the structure of the manuals are the same for every Part 145 applicant. The technical content is yours: your ratings, capability list, tooling and data. We build the manuals around that with you. If your scope calls for knowledge we don’t have, we will tell you at the start.

All questions and answers

Tell us about your shop

A few questions about your shop. We read every message ourselves and reply by email. If we look like a fit, you get a written scope and price before any work starts.

Prefer email? hello@stationreadiness.com

For example: limited airframe, class 1 accessory, limited instrument.

Do you have a facility today?

We use what you send only to reply to you. How we handle it.